Any one with suggestions on floating a pulldown cylinder on a core drill during the breakout process? Pull down cylinder is rod up, Drill string is being converted from bayonet box to threaded connection. Must achieve a pressure balance to support the drill string while allowing the unthreading action of the connections to push the top head drive up and not cause the threads to pile up. Load of the string varies with working depth.
Any ideas?